RIO Tinto East Intercourse Island Dampier

Channel Marker Refurbishment

United Industrial Solutions was contracted by Rio Tinto to carry out the refurbishment of various channel makers within Rio Tinto Shipping Channel. Utilising the UIS Ocean Driller Jack-up Barge which was mobilised from the Kaiser Marina Damper the barge was located on location external of shipping lane enabling all works to be conducted with no shipping disruptions.

View Details

RIO Tinto East Intercourse Island Dampier

Lay-by Berth Dolphin Platform Structure Refurbishment and Hook Assembly Upgrade

United Industrial Solutions (UIS) was contracted by Rio Tinto to carry out the refurbishment of three (3) Dolphin Platform Structures and the upgrade of Hook Assemblies. A key challenge for this project was access to the scope front ensuring the Lay-By berth stays operational and shipping movement not disrupted.

View Details

SINO CITIC PACIFIC (CPM)

Launder Refurbishment
Completed Floor & Walls – Surface Area 1,445m2

United Industrial Solutions (UIS) was contracted by CPM / PPS to carry out the refurbishment of two (2) onsite Launders. A key challenge for this scope was the timing of the shutdown and the Fibrous Red Zone Area.

View Details

SINO CITIC PACIFIC (CPM)

Tailings Tank Refurbishment
Completed Floor & Walls – Surface Area 1,885m2

United Industrial Solutions (UIS) was contracted by CPM / PPS to carry out the refurbishment of two (2) Concentrator and Tailings Tanks. A key challenge for this scope was the removal of the redundant inner lining.